Maldon BESS

Enhancing grid stability in the UK.

Maldon BESS is the first project we commissioned in the UK. It is operational since September 2024.

プロジェクト概要

Maldon is a 40 MW / 40 MWh Battery Energy Storage System (BESS) located in Essex, England providing vital flexibility to enable more renewable energy generation and increase the resilience of the UK electricity network. The Maldon BESS is operational since September 2024.

Located on the outskirts of London, the Maldon BESS helps to store and shift renewable energy to times of the day when it is most needed, while helping to balance electricity supply and demand second-by-second. The Maldon BESS owned by Eku Energy, is serviced and maintained by Trina Storage and is anticipated to operate for more than 20 years.

Learn more about the project and the team behind by watching this short video.

要点

イギリス
Maldon, Essex
容量 -
40 MW / 40 MWh
プロジェクトステージ -
運転中
Since
September 2024

パートナー

Acknowledgement
of Country

プロジェクト各ステージ

プロジェクトステージ
1. プロジェクト開発-初期

既存の送電インフラへの近接性、環境影響評価、土地利用の状況、地域社会との良好な関係を維持できるか等の基準に基づき候補地選定、設備基本設計を行います。このプロセスにおいて地域社会や関係者さまとの信頼関係を築きながら、プロジェクトが建設される地域の皆様からのフィードバックを頂き、プロジェクトの計画や設計に反映をしてきます。

Current Status
2. プロジェクト開発-後期

各種調査、分析の結果をもとにプロジェクトの実施について承認手続きを行います。完了をもって開発後期ステージが開始し、調査や承認結果が詳細設計に反映されます。並行して資金調達、建設工事施工業者様や機器調達を頂く企業様などとのプロジェクト実施に関する契約交渉を実施し、その交渉結果を以て資金調達を行います。資金調達に係るすべての合意(フィナンシャルクローズ)がされ、プロジェクト建設にかかわる契約締結が完了すると、いよいよ建設段階に入ります。

プロジェクトステージ
3. 建設フェーズ

選定した用地にて設備の構築に必要な土木工事や電気工事、蓄電池や電力機器の搬入・設置、電力系統への連系試験、法令に基づいた設備の保安検査などが行われます。

プロジェクトステージ
4. 運転

電力系統に接続された蓄電所は商用運転を開始し、地域の電力需要への電力供給や電力系統の周波数維持の役割のために必要なタイミングで電気を貯めたり、系統に電力を供給します。

Current Status
5. 運転終了

蓄電所がその役目を終え、運転終了を迎えると、設備は安全に解体、搬出され、撤去部材は当社の責任のもとリサイクル、廃棄されます。

Maldon