Basildon BESS

Increasing resilience of the UK network.

Basildon BESS is our first two-hour battery in the UK.

プロジェクト概要

Basildon BESS is a 28 MW / 56 MWh Battery Energy Storage System located in Essex, England, to the east of London.

To meet net zero by 2050, the UK Government has committed to decarbonise the electricity system by 2035. Battery storage is a critical enabler of this transition, helping to store and shift renewable generation to times of day when it is most needed, while helping to balance electricity supply and demand second-by-second.

Basildon BESS provides vital flexibility to enable more renewable generation and increase the resilience of the UK electricity network. The project supports the National Grid in this important network location close to other generation sources including a solar PV farm and two gas-fired peaking power stations, critical 400 kV Substations and the upcoming grid upgrade from Tilbury to Norwich.

要点

イギリス
Basildon, Essex
容量 -
28 MW / 56 MWh
プロジェクトステージ -
運転中
Since
June 2025

Acknowledgement
of Country

プロジェクト各ステージ

プロジェクトステージ
1. プロジェクト開発-初期

既存の送電インフラへの近接性、環境影響評価、土地利用の状況、地域社会との良好な関係を維持できるか等の基準に基づき候補地選定、設備基本設計を行います。このプロセスにおいて地域社会や関係者さまとの信頼関係を築きながら、プロジェクトが建設される地域の皆様からのフィードバックを頂き、プロジェクトの計画や設計に反映をしてきます。

Current Status
2. プロジェクト開発-後期

各種調査、分析の結果をもとにプロジェクトの実施について承認手続きを行います。完了をもって開発後期ステージが開始し、調査や承認結果が詳細設計に反映されます。並行して資金調達、建設工事施工業者様や機器調達を頂く企業様などとのプロジェクト実施に関する契約交渉を実施し、その交渉結果を以て資金調達を行います。資金調達に係るすべての合意(フィナンシャルクローズ)がされ、プロジェクト建設にかかわる契約締結が完了すると、いよいよ建設段階に入ります。

プロジェクトステージ
3. 建設フェーズ

選定した用地にて設備の構築に必要な土木工事や電気工事、蓄電池や電力機器の搬入・設置、電力系統への連系試験、法令に基づいた設備の保安検査などが行われます。

プロジェクトステージ
4. 運転

電力系統に接続された蓄電所は商用運転を開始し、地域の電力需要への電力供給や電力系統の周波数維持の役割のために必要なタイミングで電気を貯めたり、系統に電力を供給します。

Current Status
5. 運転終了

蓄電所がその役目を終え、運転終了を迎えると、設備は安全に解体、搬出され、撤去部材は当社の責任のもとリサイクル、廃棄されます。

Basildon

FAQs

蓄電所の仕組みや、どのような役割を果たすのか、詳しくは こちら

Videos

詳しくはこちら

プロジェクトに関する詳しい情報はこちら