Rangebank BESS

Smart design delivering value.

Rangebank BESS impresses with its compact, innovative concrete slab structure.

Project overview

Situated within the Rangebank Business Park in Melbourne’s southeast, the Rangebank Battery Energy Storage System (BESS) provides 200MW / 400MWh capacity of reliable and flexible energy to Victorians since completion in late 2024.

Jointly developed by Eku Energy and Shell Energy with minority equity partner, Perfection Private, the grid-scale battery is connected to Victoria’s transmission network at the Cranbourne Terminal Station. The Rangebank BESS helps to increase Victoria’s renewable energy hosting capacity and provides essential system services that support the safe, secure and reliable operation of Australia’s energy system. Shell Energy has exclusive access to 100% of the capacity based on a 20-year offtake. 

The BESS is built, serviced, and maintained by Fluence, a global provider of energy storage products and services, and cloud-based software for renewables and storage, utilising Fluence’s latest Gridstack product.

Watch our Rangebank BESS Partner Video to hear from our project partners to find out more.

Key Facts

Australia
Cranbourne West, Victoria
Storage capactiy -
200 MW / 400 MWh
Current status -
Operational
Since
December 2024

Acknowledgement
of Country

Eku Energy respectfully acknowledge the Bunurong People, the Traditional Custodians of the land on which the Rangebank BESS will store energy. We pay our respects to elders, past and present. We acknowledge and respect their culture, beliefs, contributions, and spiritual and historic connection with the land.

Project timeline

Current Status
1. Development

The site is selected and we are engaging with the local community to introduce the project and gather feedback before lodging all required studies for Development Approval (DA) by local councils and regulatory bodies.

Current Status
2. Pre-Construction and Financial Close

Once the Development Approval (DA) is received, we negotiate contracts with suppliers and offtakers, and secure financing of the project  ahead of financial close.

Current Status
3. Construction

We mobilise to site for ground-breaking and start building the project.

Current Status
4. Operations

Now the BESS is ready to deliver additional storage capacity to the grid and is managed by a team to ensure it operates as intended.

Current Status
5. Decommissioning

After 20+ years of its intended operational life, the BESS is decommissioned and the site is restored.

Rangebank

FAQs

If you would like to find out more about what a battery energy storage system is and how they work click here

Project images

Finished site
This well-designed project was only made possible by our project partners Shell Energy Australia, Perfection Private and EPC and BESS supplier Fluence. 

Videos

Watch 18 months of construction go by in 3 minutes.

The opening of Rangebank BESS in early December 2024 by Minister D'Ambrosio was attended by our project partners Shell Energy Australia and Perfection Private as well as Fluence Energy. We were excited to also have students and teachers from Cranbourne West Public School at the event, the recipients of one of our Rangebank BESS community grants.